>>HOME >>COMPANY >>PRODUCTS >>SOLUTIONS >>APPLICATIONS >>SERVICES >>CONTACT US

Our services

>> Project Management
>> System Design
>> Programming
>> Documentation
>> Validation
>> Installation
>> Training
>> Maintenance

PROJECT MANAGEMENT
MultiSystems Project Managers will be responsible for the system implementation since the project cradle to death. This means, the project manager will be responsible for:

>> Project Scheduling  - including the coordination of the resources and equipment involved in the project

>> Project Monitoring and Control - including tracking, identification and management of milestones, deadlines, problems and performance of the project

>> Status Reports - to both, MultiSystems and the customer, assuring that every project is completed successfully on time.

>> Quality Assurance - including the selection of the internal standards applying to the project, monitoring the project against the customer contractual requirements and monitoring the quality of the system performance

>> Manage the MultiSystems Project Change Control Procedure

SYSTEM DESIGN
A development effort is initiated with the identification of an idea or need for a system to be developed. Our technical staff will analyze our customers' requirements to document the needs for the intended system. A typical system design could include the system architecture, flowcharts, screens, databases, utilities, AutoCAD drawings for material handling and controls, Radio Frequency Site Survey (when applicable), quality assurance documentation, implementation approach and project schedule.


PROGRAMMING
Our programmers will develop programs in UNIX, Window NT/95, and PLC ladder logic. We typically program in 'C++' and Visual Basic with ODBC interface to SQL databases. We also develop Man Machine Interfaces (MMI) using the most popular packages in the industry. We will provide interfaces between analog and digital equipment such as pneumatic pistons, scanners, and weigh in motion scales into the desired application.


DOCUMENTATION
As part of the system deliverables we normally include a User Manual which is used in the day to day operation of the system. In addition, we offer a Spare Parts List of the components necessary to maintain the system operational. Depending of the complexity of the system, we will also include a System's Administration Manual. These documents are used during training sessions.

We provide documentation that complies with standards established by many Regulatory Agencies, such as FDA.


SYSTEM VALIDATION
Depending on the contractual requirements signed with the customer, MultiSystems could develop the validation protocol including Installation Qualification (IQ), Operational Qualification (OQ) and Performance Qualification (PQ) for the system. This is specially important in industries such as pharmaceuticals, chemicals and the food industry.



INSTALLATION
As part of the post-development process, MultiSystems install the system. A system could include both hardware and software components.The installation process consists of the transportation and installation of the system from the development to the target environment. It includes the hardware and software installation, setup and configuration, integration, necessary modifications, tests, and customer acceptance.



TRAINING
The development of quality system products is largely dependant upon knowledgeable and skilled people. Customer personnel will be trained operate and maintain the system.  Training will include different levels depending on the skills needed to support particular functions of the system. After the system is installed and trained, MultiSystems, Inc. will offer a maintenance contract for the hardware as well as the software installed.


MAINTENANCE
Once the system is installed and the personnel is trained, MultiSystems offers a warranty period for the system developed and implemented. A maintenance contract for the system is available after the warranty developed and implemented.

 

© Copyright 2007, MultiSystems, Inc. All rights reserved